Firevault, offline secure storage, physically disconnected from the internet
Pricing
Illustrative aviation & aerospace operating environment

Aviation operations depend on connections. Not all need to stay open.

Airports, airlines and aerospace operators rely on connected operational systems, specialist suppliers and distributed sites. Selected paths can be governed around approved work, subject to safety and continuity review.

Incident

Path exposed

Outcome

Control taken

Operational interruption

Safety dependencies

Persistent third-party paths

Unclear connection state

01 · Recent incidents

What has already happened in aviation & aerospace.

Three published incidents that show how connections carried disruption into the service. These are attributed reports, not claims that Control would have prevented them.

Supplier platform

Collins Aerospace

A cyber attack on check-in and boarding software disrupted several European airports, which fell back to manual processing.

BBC News
Airport systems

Seattle-Tacoma International Airport 2024

A cyber attack disrupted airport systems including baggage, check-in kiosks, wi-fi and display screens for several days.

The Register
Connectivity

Satellite communications 2022

A single attack on a satellite network knocked out modems across Europe, showing how one shared link can affect many dependent systems.

Wikipedia summary of public reporting

02 · About our Blueprint

Control for Aviation & Aerospace, in brief.

Aviation and aerospace operations depend on connected systems, specialist suppliers and site infrastructure. A path that is convenient during planned work may also remain available outside that purpose.

An MRO supplier needs a just-in-time ground-engineering session without extending access into unrelated operational systems. Control acts on selected physical connections, not every connection in the environment.

What it never touches: Reference design for adaptation with the service owner, not a validated deployment. Confirm complete boundary coverage, operational dependencies and the consequences of opening or closing each selected path.

Operational interruption

A disrupted aviation and aerospace connection may affect services beyond the intended maintenance or response scope.

Safety dependencies

Connections supporting safe operation of aviation and aerospace assets require careful dependency review before any intervention.

Persistent third-party paths

An always-available supplier route can extend access beyond the approved task or maintenance window.

Unclear connection state

Logical policy and tickets alone may not show which selected paths were available at a particular point.

03 · The Blueprint

Choose what to control.

An MRO supplier needs a just-in-time ground-engineering session without extending access into unrelated operational systems. Review the named support and cross-zone boundaries; operationally required links are not assumed disconnectable.

What do you want to take control of?
With Control: connection under physical control

Cyber control · An incident is spreading

An incident starts on the internet-facing side and heads for operations. With Control, the selected connection is physically withdrawn so the activity cannot travel along it.

How Cyber Control works
Fracture module emblem: magenta hexagon with a slate blade split awayRelevant ModuleFractureBreak a selected network path when an authorised incident response calls for physical separation.

Control StudioConcept view, not a site design or wiring diagram. The Module shown is a suggested starting point. Device placement, connections and operating sequences for your sites are designed with Firevault in Control Studio, with process and safety dependencies assessed first.

04 · Suggested next steps

Start with one route. Prove it. Then expand.

Every Blueprint starts with a discovery session with Firevault and the people who own the service.

  1. 1

    Book a discovery session

    Operations, engineering and security join Firevault to talk through your sites and the routes into them.

  2. 2

    Map your crossings

    Together we list every connection into operations, who owns it and what must keep running.

  3. 3

    Choose the first route

    Pick one route to control, the module that suits it and the checks that prove it works.

Your discovery session

You will leave with a map of the routes into your aviation & aerospace operations, the first one to control and a test plan agreed with your team.