Control Plans are repeatable ways of applying physical control to real security and operational problems: containing an incident, controlling supplier access, protecting critical systems and governing how AI and data cross boundaries.

IncidentsContain and reconnect

AccessSuppliers, administrators, changes

InfrastructureOT and critical systems

AI and dataAutonomy and exchange

The Plan library

Five kinds of problem.

Each Plan explains the problem, the outcome and the Modules involved. Your own design is produced with Firevault in Control Studio.

20 Control Plans

Cyber Incidents & Containment

Limit how far an incident can travel, then reconnect on evidence.

CP-01 · Control Plan
CP-01 Ransomware Containment Control Plan icon

Ransomware Containment

Limit how far ransomware can travel by physically withdrawing the connections it would use, as part of a prepared response.

Explore CP-01
CP-02 · Control Plan
CP-02 Live Incident Response Control Plan icon

Live Incident Response

Withdraw the selected connections an active intrusion is using, with service dependencies assessed before anything changes.

Explore CP-02
CP-03 · Control Plan
CP-03 Compromised Device Isolation Control Plan icon

Compromised Device Isolation

Physically separate one affected device or segment while the rest of the business keeps running.

Explore CP-03
CP-04 · Control Plan
CP-04 Data Exfiltration Interruption Control Plan icon

Data Exfiltration Interruption

Interrupt the selected outbound connections that could carry sensitive data out of your environment.

Explore CP-04
CP-05 · Control Plan
CP-05 Controlled Post-Incident Reconnection Control Plan icon

Controlled Post-Incident Reconnection

Bring withdrawn connections back one at a time, on agreed evidence and authority, instead of all at once.

Explore CP-05

Access & Third-Party Control

Connections for suppliers, administrators and changes that exist only for approved work.

CP-06 · Control Plan
CP-06 Third-Party Access Control Control Plan icon

Third-Party Access Control

Supplier and vendor connections that exist only for approved work, then close when the work ends.

Explore CP-06
CP-07 · Control Plan
CP-07 Restricted Environment Access Control Plan icon

Restricted Environment Access

Access to sensitive or segregated environments that is staged, deliberate and never left standing open.

Explore CP-07
CP-08 · Control Plan
CP-08 Privileged Infrastructure Access Control Plan icon

Privileged Infrastructure Access

Administrator connections to core infrastructure that exist when privileged work is approved, not permanently.

Explore CP-08
CP-09 · Control Plan
CP-09 Scheduled Critical Maintenance Control Plan icon

Scheduled Critical Maintenance

Connections for planned maintenance that open for the agreed window and close when it ends.

Explore CP-09
CP-10 · Control Plan
CP-10 High-Risk Production Changes Control Plan icon

High-Risk Production Changes

High-risk changes to production made through a connection that exists only for the approved change.

Explore CP-10

Infrastructure & Critical Systems

Fewer standing routes into operational technology and essential systems.

CP-11 · Control Plan
CP-11 IT/OT Boundary Protection Control Plan icon

IT/OT Boundary Protection

Control the crossings between business IT and operational technology, without treating the process like office IT.

Explore CP-11
CP-12 · Control Plan
CP-12 Critical System Exposure Reduction Control Plan icon

Critical System Exposure Reduction

Reduce the number of connections that can reach essential systems, so fewer routes stay open by default.

Explore CP-12
CP-13 · Control Plan
CP-13 Supply Chain Compromise Containment Control Plan icon

Supply Chain Compromise Containment

Limit how far a compromised supplier, product or service can reach into your environment.

Explore CP-13
CP-14 · Control Plan
CP-14 Industrial Engineering Access Control Plan icon

Industrial Engineering Access

Engineering and vendor access to PLCs, controllers and industrial systems that is just-in-time, not standing.

Explore CP-14
CP-15 · Control Plan
CP-15 Remote Facility Containment Control Plan icon

Remote Facility Containment

Withdraw the communications link to an affected remote site while local operation continues as assessed.

Explore CP-15

Governance & Controlled Operations

Authority and evidence for every connection change.

CP-16 · Control Plan
CP-16 Connection Assurance & Evidence Control Plan icon

Connection Assurance & Evidence

Show who approved each connection change, when it happened and what state the connection was observed in.

Explore CP-16
CP-17 · Control Plan
CP-17 Emergency Authority Intervention Control Plan icon

Emergency Authority Intervention

Give designated decision-makers a defined way to change selected connections when circumstances demand.

Explore CP-17

AI & Controlled Data Movement

Control how AI and autonomous systems reach data, and how data crosses boundaries.

CP-18 · Control Plan
CP-18 AI Connectivity Control Control Plan icon

AI Connectivity Control

Withdraw the connections an AI system uses to reach data and operations, on an authorised decision.

Explore CP-18
CP-19 · Control Plan
CP-19 Cross-Boundary Data Exchange Control Plan icon

Cross-Boundary Data Exchange

Move data between separate environments through a controlled exchange path that does not stay open.

Explore CP-19
CP-20 · Control Plan
CP-20 Autonomous System Intervention Control Plan icon

Autonomous System Intervention

Withdraw the communications of an autonomous system acting beyond its remit, through a defined authority.

Explore CP-20

Your next step

Start with one critical connection.

Choose one important connection. Identify who needs it, who can authorise a change and what must keep working before you extend the design.