Ukrainian distribution companies 2015
Attackers used remote access to open substation breakers, cutting power to around 230,000 customers for several hours.
Wikipedia summary of public reporting
Electricity networks connect EMS, SCADA, IEC 61850 substations and distributed energy resources. A reference design can help operators review selected paths without assuming every operational connection can be interrupted.
Incident
Path exposed
Outcome
Control taken
Continuity
Cross-zone routes
Communications
Configuration readiness
01 · Recent incidents
Three published incidents that show how connections carried disruption into the service. These are attributed reports, not claims that Control would have prevented them.
Attackers used remote access to open substation breakers, cutting power to around 230,000 customers for several hours.
Wikipedia summary of public reportingMalware built for industrial protocols switched off part of the Kyiv supply, showing attacks designed for grid equipment itself.
Wikipedia summary of public reportingAn attack on a satellite network cut remote monitoring and control for thousands of German wind turbines, although they kept generating.
Wikipedia summary of public reporting02 · About our Blueprint
Grid operators should map corporate, market and operational interfaces against actual dependencies. Legacy RTUs, protection IEDs and DER controllers have differing maintenance and availability needs.
A substation supplier needs a just-in-time maintenance session while telemetry and protection remain available. Control acts on selected physical connections, not every connection in the environment.
What it never touches: Reference design for adaptation with the service owner, not a validated deployment. Confirm complete boundary coverage, operational dependencies and the consequences of opening or closing each selected path.
A change to a selected path may affect service, visibility or coordination.
Corporate and supplier connections should be mapped against operational dependencies.
Remote links may support essential monitoring or control functions.
Selected configurations and recovery dependencies merit review.
03 · The Blueprint
A substation supplier needs a just-in-time maintenance session while telemetry and protection remain available. Review the named support and cross-zone boundaries; operationally required links are not assumed disconnectable.
CNI control · Critical assets with several paths
Essential assets are reachable through several connections. With Control, each connection into the named asset is controlled, so no single forgotten route leaves it exposed.
How CNI Control works
Concept view, not a site design or wiring diagram. The Module shown is a suggested starting point. Device placement, connections and operating sequences for your sites are designed with Firevault in Control Studio, with process and safety dependencies assessed first.
04 · Suggested next steps
Every Blueprint starts with a discovery session with Firevault and the people who own the service.
Operations, engineering and security join Firevault to talk through your sites and the routes into them.
Together we list every connection into operations, who owns it and what must keep running.
Pick one route to control, the module that suits it and the checks that prove it works.
You will leave with a map of the routes into your energy operations, the first one to control and a test plan agreed with your team.