Ferrari 2023
A threat actor demanded a ransom over client contact details. Ferrari refused to pay and said operations were not affected.
Ferrari statement
Motorsport teams and event operators rely on engineering data, telemetry, garage systems, suppliers and event-site connectivity. A defined path policy may support approved access while accounting for event operations and engineering safety.
Incident
Path exposed
Outcome
Control taken
Operational interruption
Safety dependencies
Persistent third-party paths
Unclear connection state
01 · Recent incidents
Three published incidents that show how connections carried disruption into the service. These are attributed reports, not claims that Control would have prevented them.
A threat actor demanded a ransom over client contact details. Ferrari refused to pay and said operations were not affected.
Ferrari statementThe governing body reported unauthorised access to email accounts through phishing.
FIA statementA cyber attack shut down production and IT systems, halting manufacturing for weeks.
BBC News02 · About our Blueprint
Motorsport operations depend on connected systems, specialist suppliers and site infrastructure. A path that is convenient during planned work may also remain available outside that purpose.
A technical supplier needs a just-in-time garage-engineering session during an agreed event support window. Control acts on selected physical connections, not every connection in the environment.
What it never touches: Reference design for adaptation with the service owner, not a validated deployment. Confirm complete boundary coverage, operational dependencies and the consequences of opening or closing each selected path.
A disrupted motorsport connection may affect services beyond the intended maintenance or response scope.
Connections supporting safe operation of motorsport assets require careful dependency review before any intervention.
An always-available supplier route can extend access beyond the approved task or maintenance window.
Logical policy and tickets alone may not show which selected paths were available at a particular point.
03 · The Blueprint
A technical supplier needs a just-in-time garage-engineering session during an agreed event support window. Review the named support and cross-zone boundaries; operationally required links are not assumed disconnectable.
Cyber control · An incident is spreading
An incident starts on the internet-facing side and heads for operations. With Control, the selected connection is physically withdrawn so the activity cannot travel along it.
How Cyber Control works
Concept view, not a site design or wiring diagram. The Module shown is a suggested starting point. Device placement, connections and operating sequences for your sites are designed with Firevault in Control Studio, with process and safety dependencies assessed first.
04 · Suggested next steps
Every Blueprint starts with a discovery session with Firevault and the people who own the service.
Operations, engineering and security join Firevault to talk through your sites and the routes into them.
Together we list every connection into operations, who owns it and what must keep running.
Pick one route to control, the module that suits it and the checks that prove it works.
You will leave with a map of the routes into your motorsport operations, the first one to control and a test plan agreed with your team.