Firevault, offline secure storage, physically disconnected from the internet
Pricing
Illustrative telecommunications operating environment

Telecommunications depend on connections. Not all need to stay open.

Telecommunications providers operate management, signalling, core and access networks alongside supplier and field-service connections. Physical governance may support selected boundaries while preserving reviewed service dependencies.

Incident

Path exposed

Outcome

Control taken

Operational interruption

Safety dependencies

Persistent third-party paths

Unclear connection state

01 · Recent incidents

What has already happened in telecommunications.

Three published incidents that show how connections carried disruption into the service. These are attributed reports, not claims that Control would have prevented them.

Core networks

US telecommunications carriers 2024

A state-sponsored group was reported to have reached the networks of several major carriers, including systems used for lawful intercept.

Wikipedia summary of public reporting

02 · About our Blueprint

Control for Telecommunications, in brief.

Telecommunications operations depend on connected systems, specialist suppliers and site infrastructure. A path that is convenient during planned work may also remain available outside that purpose.

An equipment vendor needs a just-in-time management session while subscriber service remains an explicit dependency. Control acts on selected physical connections, not every connection in the environment.

What it never touches: Reference design for adaptation with the service owner, not a validated deployment. Confirm complete boundary coverage, operational dependencies and the consequences of opening or closing each selected path.

Operational interruption

A disrupted telecommunications connection may affect services beyond the intended maintenance or response scope.

Safety dependencies

Connections supporting safe operation of telecommunications assets require careful dependency review before any intervention.

Persistent third-party paths

An always-available supplier route can extend access beyond the approved task or maintenance window.

Unclear connection state

Logical policy and tickets alone may not show which selected paths were available at a particular point.

03 · The Blueprint

Choose what to control.

An equipment vendor needs a just-in-time management session while subscriber service remains an explicit dependency. Review the named support and cross-zone boundaries; operationally required links are not assumed disconnectable.

What do you want to take control of?
With Control: connection under physical control

Cyber control · An incident is spreading

An incident starts on the internet-facing side and heads for operations. With Control, the selected connection is physically withdrawn so the activity cannot travel along it.

How Cyber Control works
Fracture module emblem: magenta hexagon with a slate blade split awayRelevant ModuleFractureBreak a selected network path when an authorised incident response calls for physical separation.

Control StudioConcept view, not a site design or wiring diagram. The Module shown is a suggested starting point. Device placement, connections and operating sequences for your sites are designed with Firevault in Control Studio, with process and safety dependencies assessed first.

04 · Suggested next steps

Start with one route. Prove it. Then expand.

Every Blueprint starts with a discovery session with Firevault and the people who own the service.

  1. 1

    Book a discovery session

    Operations, engineering and security join Firevault to talk through your sites and the routes into them.

  2. 2

    Map your crossings

    Together we list every connection into operations, who owns it and what must keep running.

  3. 3

    Choose the first route

    Pick one route to control, the module that suits it and the checks that prove it works.

Your discovery session

You will leave with a map of the routes into your telecommunications operations, the first one to control and a test plan agreed with your team.