Firevault, offline secure storage, physically disconnected from the internet
Pricing

Control Module FV-03

Relay Controlled access through a security airlock

Relay establishes a controlled physical airlock between three security zones. Connectivity is staged so the permitted connection is available at the appropriate step, with the operating sequence designed to prevent an unintended end-to-end path.

Make access possible without opening a permanent route.

Incident

Path exposed

Outcome

Control taken

The problem

The problem Relay addresses.

Third-party or remote access often passes from a less-trusted network towards critical systems. A single time-limited link may not be enough where an intermediate approval or staging boundary is required.

What it does

Relay establishes a controlled physical airlock between three security zones. Connectivity is staged so the permitted connection is available at the appropriate step, with the operating sequence designed to prevent an unintended end-to-end path.

Before a connection changes

Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.

The physical-control arrangement

Public, intermediate and private zones, staged in sequence. Agreed before it is needed.

A public, intermediate and private-zone arrangement using separately controlled connections. The approved sequence and permitted states must be independently validated for the deployed hardware and controller.

  1. Authorise the task

    Authorise the task and its destination.

  2. Check the inner connection

    Check the inner connection is in the required state.

  3. Permit the first stage

    Permit the first controlled stage.

  4. Withdraw before the next

    Withdraw the first stage before authorising the next, where required.

  5. Return to rest

    Complete the work and return to the agreed resting state.

What it does

  • Stage approved connectivity between public, intermediate and private zones, without leaving an open end-to-end route.
  • Acts only on the registered crossings in the agreed design.
  • Records the command, the reported state and any independent verification separately.

What it does not claim

  • Relay does not replace identity verification, privileged access management or session monitoring. Interlocking must be engineered and tested, not inferred from the name.
  • Act on routes outside the registered design.

See it work

A staged airlock. Never an open end-to-end path.

Public, intermediate and private zones joined by two connections. Follow the mutually exclusive sequence: the first stage closes before the second opens, so the two connections are not available at the same time.

Public

Intermediate

Private

Public zoneSupplier or remote user
Intermediate zoneStaging and approval boundary
Private zoneCritical system to be maintained

Stage

The airlock at rest

Both connections rest disconnected. There is no route from the public zone into the intermediate or private zones.

Resting state agreed with the system owner.

Commanded
No change.
Reported by the control point
Both held disconnected.
Independently verified
Matches the state confirmed at the last test.

Selected boundary

Relay module emblem: magenta ring around a slate three-part airlock, for controlled access through a security airlockRelay · FV-03 First connectionPublic zone to intermediate zone · IT, OT, Cyber
Normal state
Held disconnected.
What changes it
An authorised task with a named destination.
What Relay does
Relay permits this connection only while the inner connection is withdrawn.

Concept illustration. The disallowed stage shows a combination the sequence must prevent, not a state the system enters. Relay does not replace identity verification, privileged access management or session monitoring.

Operational boundaries and tests

Agreed in advance. Tested before it counts.

Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.

Before you rely on it

What has to be true first.

  • The design names each boundary, its normal state and who can change it.
  • Dependencies are mapped, including what must keep running.
  • In OT and CNI, the process reaches a safe state before a route is withdrawn.
  • Failure behaviour and the restoration method are agreed and tested.
  • Wireless, cellular and other routes outside the design need their own controls.

Acceptance tests

Prove the operating conditions, not just the command.

  • Command, device-reported state and independent verification are recorded as separate observations.
  • Safe disconnection and restoration are tested in a planned window.
  • The interlock sequence is proven for the deployed hardware and controller, including the disallowed simultaneous path.
  • Alternative physical, wireless and cellular paths remain in scope for architecture review.

No guaranteed timing or universal fail-closed state is implied. Observed timings belong to the tested installation.

Related Control Plans

Adopt Relay through a Control Plan.

The solutions. CP-01 to CP-17 apply the appropriate Modules to defined security and operational problems.

CP-07 Control Plan

CP-07 Restricted Environment Access Control Plan iconRestricted Environment Access

Access to sensitive or segregated environments that is staged, deliberate and never left standing open.

Open CP-07

CP-06 Control Plan

CP-06 Third-Party Access Control Control Plan iconThird-Party Access Control

Supplier and vendor connections that exist just-in-time, only for approved work, then close when the work ends.

Open CP-06

Industry Blueprints adapt the Plans to each sector's systems, suppliers, continuity requirements and safety constraints. Explore the Blueprints.

Questions

Straight answers.

For security, network and operations owners.

What does Relay do?

Relay establishes a controlled physical airlock between three security zones. Connectivity is staged so the permitted connection is available at the appropriate step, with the operating sequence designed to prevent an unintended end-to-end path.

What problem does it address?

Third-party or remote access often passes from a less-trusted network towards critical systems. A single time-limited link may not be enough where an intermediate approval or staging boundary is required.

How is the physical control arranged?

A public, intermediate and private-zone arrangement using separately controlled connections. The approved sequence and permitted states must be independently validated for the deployed hardware and controller.

What does it not claim?

Relay does not replace identity verification, privileged access management or session monitoring. Interlocking must be engineered and tested, not inferred from the name.

How does Relay relate to Control Plans?

Modules are the physical control capabilities. Control Plans apply the appropriate Modules to a defined security or operational problem; the design for your own connections is produced with Firevault in Control Studio. Relay is used in CP-07 Restricted Environment Access and CP-06 Third-Party Access Control.

Is this a validated installation?

No. It is a reference arrangement. Deployment drawings, interlock behaviour, approvals, link-state verification and failure modes are confirmed for your estate in discovery and acceptance testing.

Your next step

Start with one critical connection.

We will help you identify the boundary, assess its dependencies and select the right Modules and Control Plans.

Discuss a critical connectionOr see all nine Modules