What it does
Unlink removes selected persistent connections that leave critical systems unnecessarily reachable. The route becomes physically unavailable through the controlled crossing until a separate approved need justifies its restoration.
Control Module FV-07
Unlink removes selected persistent connections that leave critical systems unnecessarily reachable. The route becomes physically unavailable through the controlled crossing until a separate approved need justifies its restoration.
If access is not needed, withdraw the path.
Incident
Path exposed
Outcome
Control taken
The problem
A critical system may remain reachable for convenience long after a maintenance job or operational change has ended. That standing route is available to legitimate operators and attackers alike.
What it does
Unlink removes selected persistent connections that leave critical systems unnecessarily reachable. The route becomes physically unavailable through the controlled crossing until a separate approved need justifies its restoration.
Before a connection changes
Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.
The physical-control arrangement
An asset-invisibility pattern that removes physical reachability over the defined connection. Any alternative access paths must be identified and managed separately.
Inventory the standing routes to the critical system.
Agree which routes can safely remain disconnected.
Withdraw the registered physical connection.
Confirm the intended loss of reachability on that route.
Permit restoration only for an approved purpose and return it to the resting state.
What it does
What it does not claim
See it work
A named critical system is reachable over one specific standing route. After Unlink withdraws it, the system is no longer reachable over that route. Other routes are shown for what they are.
Access routes
Controlled crossing
Critical system
Stage
The critical system is reachable over a standing maintenance route that no one is using. It is available to legitimate operators and attackers alike.
Found in the route inventory.
Selected boundary
Concept illustration. Unlink does not make a system universally invisible, remove all radio or cellular paths, or discover unknown dependencies automatically.
Operational boundaries and tests
Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.
Before you rely on it
Acceptance tests
No guaranteed timing or universal fail-closed state is implied. Observed timings belong to the tested installation.
Related Control Plans
The solutions. CP-01 to CP-17 apply the appropriate Modules to defined security and operational problems.
CP-12 Control Plan
Reduce the number of connections that can reach essential systems, so fewer routes stay open by default.
CP-03 Control Plan Where appropriate
Physically separate one affected device or segment while the rest of the business keeps running.
Industry Blueprints adapt the Plans to each sector's systems, suppliers, continuity requirements and safety constraints. Explore the Blueprints.
Questions
For security, network and operations owners.
Unlink removes selected persistent connections that leave critical systems unnecessarily reachable. The route becomes physically unavailable through the controlled crossing until a separate approved need justifies its restoration.
A critical system may remain reachable for convenience long after a maintenance job or operational change has ended. That standing route is available to legitimate operators and attackers alike.
An asset-invisibility pattern that removes physical reachability over the defined connection. Any alternative access paths must be identified and managed separately.
Unlink does not make a system universally invisible, remove all radio or cellular paths, or discover unknown dependencies automatically.
Modules are the physical control capabilities. Control Plans apply the appropriate Modules to a defined security or operational problem; the design for your own connections is produced with Firevault in Control Studio. Unlink is used in CP-12 Critical System Exposure Reduction and CP-03 Compromised Device Isolation (where appropriate).
No. It is a reference arrangement. Deployment drawings, interlock behaviour, approvals, link-state verification and failure modes are confirmed for your estate in discovery and acceptance testing.
Your next step
We will help you identify the boundary, assess its dependencies and select the right Modules and Control Plans.
Discuss a critical connectionOr see all nine Modules