Firevault, offline secure storage, physically disconnected from the internet
Pricing

Control Module FV-05

Validate Independent two-person connection approval

Validate requires two independent authorisations for the same proposed connection-state change before the physical instruction can be released. It brings a four-eye decision pattern to high-consequence access.

No single approval opens a protected path.

Incident

Path exposed

Outcome

Control taken

The problem

The problem Validate addresses.

An individual privileged credential should not necessarily be enough to expose a sensitive network boundary. Some actions require both an accountable requester and an independent approver.

What it does

Validate requires two independent authorisations for the same proposed connection-state change before the physical instruction can be released. It brings a four-eye decision pattern to high-consequence access.

Before a connection changes

Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.

The physical-control arrangement

A four-eye decision before the physical change. Agreed before it is needed.

A four-eye authorisation workflow integrated with the selected physical-control point. Identity evidence, approval integrity and any certificate requirements must be implemented by the chosen supporting systems.

  1. Name the change

    Name the connection, the task and the duration.

  2. First request

    Capture the first authorised request.

  3. Independent approval

    Capture independent approval against the same unchanged parameters.

  4. Release the instruction

    Release the physical instruction.

  5. Record the evidence

    Record both approvals, the command and the state evidence.

What it does

  • Require two independent approvals for the same proposed connection change before it is released.
  • Acts only on the registered crossings in the agreed design.
  • Records the command, the reported state and any independent verification separately.

What it does not claim

  • Validate does not claim two-person certification, cryptographic proof or native identity capability until the specific integration has been validated.
  • Act on routes outside the registered design.

See it work

Two approvals. Then the crossing may change.

The requester and an independent approver converge on a policy gate. The protected crossing changes only when both approvals match the same unchanged request.

Approvals

Policy gate

Protected

RequesterAccountable for the task
Independent approverA separate person and role
Policy gateSame connection, task and duration
Protected systemHigh-consequence boundary

Stage

Held disconnected

The protected crossing rests disconnected. No single credential can release it.

Normal state agreed by the system owner.

Commanded
No change.
Reported by the control point
Held disconnected.
Independently verified
Matches the state confirmed at the last test.

Selected boundary

Validate module emblem: magenta and slate pair of panels, for independent two-person connection approvalValidate · FV-05 Protected crossingPolicy gate to protected system · IT, OT, CNI, Cyber
Normal state
Held disconnected.
What changes it
Two independent approvals of the same unchanged request.
What Validate does
Validate releases the physical instruction only after both approvals match.

Concept illustration. Identity evidence, approval integrity and any certificate requirements are provided by the chosen supporting systems and must be validated for the integration.

Operational boundaries and tests

Agreed in advance. Tested before it counts.

Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.

Before you rely on it

What has to be true first.

  • The design names each boundary, its normal state and who can change it.
  • Dependencies are mapped, including what must keep running.
  • In OT and CNI, the process reaches a safe state before a route is withdrawn.
  • Failure behaviour and the restoration method are agreed and tested.
  • Wireless, cellular and other routes outside the design need their own controls.

Acceptance tests

Prove the operating conditions, not just the command.

  • Command, device-reported state and independent verification are recorded as separate observations.
  • Safe disconnection and restoration are tested in a planned window.
  • A changed request, a missing approval and a repeated approver are each shown not to release the instruction.
  • Alternative physical, wireless and cellular paths remain in scope for architecture review.

No guaranteed timing or universal fail-closed state is implied. Observed timings belong to the tested installation.

Related Control Plans

Adopt Validate through a Control Plan.

The solutions. CP-01 to CP-17 apply the appropriate Modules to defined security and operational problems.

CP-17 Control Plan

CP-17 Emergency Authority Intervention Control Plan iconEmergency Authority Intervention

Give designated decision-makers a defined way to change selected connections when circumstances demand.

Open CP-17

CP-16 Control Plan

CP-16 Connection Assurance & Evidence Control Plan iconConnection Assurance & Evidence

Show who approved each connection change, when it happened and what state the connection was observed in.

Open CP-16

Industry Blueprints adapt the Plans to each sector's systems, suppliers, continuity requirements and safety constraints. Explore the Blueprints.

Questions

Straight answers.

For security, network and operations owners.

What does Validate do?

Validate requires two independent authorisations for the same proposed connection-state change before the physical instruction can be released. It brings a four-eye decision pattern to high-consequence access.

What problem does it address?

An individual privileged credential should not necessarily be enough to expose a sensitive network boundary. Some actions require both an accountable requester and an independent approver.

How is the physical control arranged?

A four-eye authorisation workflow integrated with the selected physical-control point. Identity evidence, approval integrity and any certificate requirements must be implemented by the chosen supporting systems.

What does it not claim?

Validate does not claim two-person certification, cryptographic proof or native identity capability until the specific integration has been validated.

How does Validate relate to Control Plans?

Modules are the physical control capabilities. Control Plans apply the appropriate Modules to a defined security or operational problem; the design for your own connections is produced with Firevault in Control Studio. Validate is used in CP-17 Emergency Authority Intervention and CP-16 Connection Assurance & Evidence.

Is this a validated installation?

No. It is a reference arrangement. Deployment drawings, interlock behaviour, approvals, link-state verification and failure modes are confirmed for your estate in discovery and acceptance testing.

Your next step

Start with one critical connection.

We will help you identify the boundary, assess its dependencies and select the right Modules and Control Plans.

Discuss a critical connectionOr see all nine Modules