What it does
Validate requires two independent authorisations for the same proposed connection-state change before the physical instruction can be released. It brings a four-eye decision pattern to high-consequence access.
Control Module FV-05
Validate requires two independent authorisations for the same proposed connection-state change before the physical instruction can be released. It brings a four-eye decision pattern to high-consequence access.
No single approval opens a protected path.
Incident
Path exposed
Outcome
Control taken
The problem
An individual privileged credential should not necessarily be enough to expose a sensitive network boundary. Some actions require both an accountable requester and an independent approver.
What it does
Validate requires two independent authorisations for the same proposed connection-state change before the physical instruction can be released. It brings a four-eye decision pattern to high-consequence access.
Before a connection changes
Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.
The physical-control arrangement
A four-eye authorisation workflow integrated with the selected physical-control point. Identity evidence, approval integrity and any certificate requirements must be implemented by the chosen supporting systems.
Name the connection, the task and the duration.
Capture the first authorised request.
Capture independent approval against the same unchanged parameters.
Release the physical instruction.
Record both approvals, the command and the state evidence.
What it does
What it does not claim
See it work
The requester and an independent approver converge on a policy gate. The protected crossing changes only when both approvals match the same unchanged request.
Approvals
Policy gate
Protected
Stage
The protected crossing rests disconnected. No single credential can release it.
Normal state agreed by the system owner.
Selected boundary
Concept illustration. Identity evidence, approval integrity and any certificate requirements are provided by the chosen supporting systems and must be validated for the integration.
Operational boundaries and tests
Every deployment starts with a named physical boundary, a defined normal state, mapped dependencies, an agreed decision-maker, failure behaviour and a tested restoration method. Disconnecting one controlled link does not remove alternative routes outside the design.
Before you rely on it
Acceptance tests
No guaranteed timing or universal fail-closed state is implied. Observed timings belong to the tested installation.
Related Control Plans
The solutions. CP-01 to CP-17 apply the appropriate Modules to defined security and operational problems.
CP-17 Control Plan
Give designated decision-makers a defined way to change selected connections when circumstances demand.
CP-16 Control Plan
Show who approved each connection change, when it happened and what state the connection was observed in.
Industry Blueprints adapt the Plans to each sector's systems, suppliers, continuity requirements and safety constraints. Explore the Blueprints.
Questions
For security, network and operations owners.
Validate requires two independent authorisations for the same proposed connection-state change before the physical instruction can be released. It brings a four-eye decision pattern to high-consequence access.
An individual privileged credential should not necessarily be enough to expose a sensitive network boundary. Some actions require both an accountable requester and an independent approver.
A four-eye authorisation workflow integrated with the selected physical-control point. Identity evidence, approval integrity and any certificate requirements must be implemented by the chosen supporting systems.
Validate does not claim two-person certification, cryptographic proof or native identity capability until the specific integration has been validated.
Modules are the physical control capabilities. Control Plans apply the appropriate Modules to a defined security or operational problem; the design for your own connections is produced with Firevault in Control Studio. Validate is used in CP-17 Emergency Authority Intervention and CP-16 Connection Assurance & Evidence.
No. It is a reference arrangement. Deployment drawings, interlock behaviour, approvals, link-state verification and failure modes are confirmed for your estate in discovery and acceptance testing.
Your next step
We will help you identify the boundary, assess its dependencies and select the right Modules and Control Plans.
Discuss a critical connectionOr see all nine Modules