Firevault, offline secure storage, physically disconnected from the internet
Pricing

For OT, control systems and industrial engineers

The plant has to keep running.
Not every route into it does.

Vendor support, office links and update routes sit open between jobs. Control lets you decide when each one exists, and agree in advance what happens to the process when one is cut.

Engineered with you. Start with one boundary.

Business network

Under attack

Plant control

Still running

Why it matters

It has happened
to organisations like yours.

Published cases from the last few years. In each one, a connection that was always there shaped what happened next.

Colonial Pipeline

May 2021

The path

A legacy VPN account with no multi-factor authentication.

What followed

Ransomware reached the business network. To keep it away from the industrial network, the 5,500-mile fuel pipeline was shut down.

When specific paths cannot be withdrawn, stopping everything can be the only safe choice.

Municipal Water Authority of Aliquippa

November 2023

The path

A controller at a water booster station that could be reached from the internet.

What followed

Attackers compromised the device. The authority switched to manual operation and reported no known risk to drinking water.

A standing path straight to a controller.

Jaguar Land Rover

September 2025

The path

Attackers got into JLR’s IT systems.

What followed

To contain the attack, the company shut systems down. Production stopped across its UK plants for around five weeks, at an estimated cost to the UK economy of £1.9 billion.

When you can’t withdraw specific connections, you end up withdrawing everything.

These incidents show how a connection path can shape what happens next. They are not claims about what any single control would have prevented.

What it is

Your plant has to stay connected. Not every route into it does.

Vendor support, office links and update routes sit open between jobs. If only you could close them until they were needed.

Welcome to Control by Firevault.

Control physically connects and disconnects the network links you choose, on commands sent over a separate line, with every change on record.

  • Physically disconnectedAt the boundary, not inside the control system

  • Commanded on a separate lineSo it still works when the office network is under attack

  • Agreed before it is neededWhat each cut means for the process, tested in advance

What it gives you

The plant keeps running.
The open doors do not.

OT monitoring tells you what is talking to what. Closing a route usually means a change request, a vendor call or a shutdown. Control gives you a planned, physical way to open and close the routes into the plant.

Choose a situation to see the difference.

Choose a situation

SituationThe PLC vendor’s remote connection has been open since commissioning. Nobody on site knows when it is in use.

TodayStanding connection
VendorRemote support
Remote connectionOpen since commissioning
ControllersOn the line

The connection is always there, whether anyone booked it or not.

With ControlPhysically controlled
VendorRemote support
Remote connectionJust-in-time sessions only
ControllersOn the line

The route opens just-in-time when you book a session, to the equipment it is for. Then it closes.

Concept illustration. Outcomes depend on your design and the Plans in place.

Just-in-time vendor access, on your terms.

Remote support connects just-in-time when you book it, and only to the equipment it is for.

A planned IT/OT cut.

What happens when the link to the office is cut is worked out and tested before it is ever needed.

Updates on an approved path.

Files cross into the plant on one approved path, in a set window. Then it closes.

Who it’s for

Picture the moment
it reaches the plant.

Three plants. Three bad shifts. And the difference it makes when the boundary was engineered in advance.

Switch between without and with Control, or let each one turn by itself.

Illustrative workplace photograph for Gareth, Control systems engineer, food manufacturer; not a real customer

Meet Gareth.

Control systems engineer, food manufacturer

Thursday · 22:10

“The vendor’s remote connection has been open since commissioning. Is anyone using it now?”

Nobody on site knows when it is in use, and closing it means a call to the vendor and a change request.

The line runs. The vendor still gets in when it is needed.

Relay · CP-06

Third-Party Access Control

Illustrative workplace photograph for Sian, OT engineer, energy network; not a real customer

Meet Sian.

OT engineer, energy network

Saturday · 05:40

“There is an attacker in the corporate network. What happens if we pull the IT/OT link?”

Nobody knows what the cut does to the historian, the alarms or the remote sites, so the link stays up.

The lights stay on.

Fracture · CP-02

Live Incident Response

Illustrative workplace photograph for Dev, Automation engineer, pharmaceutical plant; not a real customer

Meet Dev.

Automation engineer, pharmaceutical plant

Tuesday · 13:15

“Why can the packaging line’s PLCs and controllers reach the office network?”

Unpicking every connection means a shutdown nobody will approve, so the extra paths stay.

The line only talks to what it needs.

Array · CP-12

Critical System Exposure Reduction

Gareth, Sian and Dev are illustrative.

Use cases

Where most plants start, one boundary at a time.

Each starting point is a published Control Plan, commissioned with your engineers and tested in a maintenance window.

Vendor remote access

The PLC vendor’s connection has been open since commissioning. With Control, it opens just-in-time when you book a session, to the equipment it is for, then closes.

Routes involved

Vendor support toolsIntegrator VPNsOEM remote access

Who decides: The control systems engineer books each session

Office to plant

An attack in the business network is one link away from plant control. With Control, the IT/OT link is cut on a separate line, as tested, and the plant runs on local control.

Routes involved

IT/OT linkHistorian and MES feedsERP connections

Who decides: Agreed in advance; the operational owner decides

Patch and update routes

Updates cross by whatever route is open at the time. With Control, files cross on one approved path, in a set window, to a named destination.

Routes involved

Patch serversProject file transfersRemovable media workflows

Who decides: Two approvals for each transfer

Critical controllers

Controllers that can reach the office network for no reason. With Control, each critical controller keeps only its defined connections.

Routes involved

Packaging and process PLCsSafety-adjacent controllersHMIs

Who decides: The automation engineer defines the set

Engineering access

Engineering workstations can change controllers at any time. With Control, changes to critical connections need the approvals you set, and each one is recorded.

Routes involved

Engineering workstationsProgramming laptopsRemote engineering

Who decides: The approvals you set

Published Control Plans

A method you can
review on paper first.

Each Plan is published for you to check before you commit: what it covers, what triggers it, who decides and how it is tested. Each one is driven by one Control module.

CP-06 Supplier access

Third-Party Access Control

Suppliers, vendors and service providers holding standing remote access.

With Control: Vendor routes open just-in-time for a booked session, to the equipment it is for, then close.

Key module: RelayStage access through an airlock.

Read CP-06

CP-02 Live intrusion

Live Incident Response

An attacker already active inside, moving towards critical systems with valid credentials.

With Control: The IT/OT link is cut on a separate line when an attack is confirmed, and the plant runs on local control.

Key module: FractureBreak the path.

Read CP-02

CP-11 Flat networks

IT/OT Boundary Protection

Trust boundaries that exist on the network drawing, but not physically.

With Control: Sites and cells are held apart at Layer 1, so a problem stays where it starts.

Key module: IsolateHold a double boundary.

Read CP-11

CP-19 Crossing environments

Cross-Boundary Data Exchange

Updates and material that must cross between separate environments by whatever route is open.

With Control: Patches and project files cross on one approved path, to a named destination, then it closes.

Key module: TransferControl the diode-protected path.

Read CP-19
See every published Control Plan

See how Plans combine for your sector in the Control Blueprints.

Control the path. Protect the asset.Keep PLC programs, HMI projects, gold images and safety configurations in Offline Secure Storage®, physically disconnected and ready for a rebuild.

OSS for ransomware recovery and OT

Firevault, as featured in

techradar proyahoo!financeChannel InsiderSecurity BuyerSecurityBriefCyber Essentials Plus certified

How it works

Engineered with you.
One boundary at a time.

No shutdown, no re-engineering. Start with the boundary you worry about most, commission it, then move to the next.

  1. 01Normal shift
  2. 02Decision
  3. 03Cut
  4. 04Back
  1. Boundary ready
    Business network
    Plant control

    Running, with control ready.

    Office traffic to the historian goes through your firewall. The IT/OT link can be cut at any moment.

  2. Attack in the office
    Business network
    Command out of band
    Plant control

    Agreed before it is needed.

    The cut and what it means for the process were tested last spring. The command goes on a separate line.

  3. Cut at the boundary
    Business network
    Plant control

    Cut at the boundary.

    The IT/OT link is physically disconnected. Operators keep control from the HMIs on site.

  4. Reconnected in order
    Business network
    Plant control

    Reconnected in order.

    Plant control first, after its own checks, then the remote sites, one at a time.

Worth knowing. A cut removes the route, not power or control logic. What depends on that route stops talking, so each cut is worked out with you and tested in a maintenance window first.

See it for yourself

One network.
Four connection states.

Step through a normal shift, a booked support session, an attack in the office and getting back to normal.

Choose a state, or let it play.

Connection states

Z0Vendors

Remote support

Z1Business network

Office and ERP

Z2Plant control

PLCs and HMIs

Vendor
IT systems
Plant control
Vendor routeDisconnected
IT/OT linkConnected
Vendor routeDisconnected
IT/OT linkConnected
AuthorisedSeparate command path, configured for the deployment

The approved operating state

Normal shift

The vendor route is disconnected because no session is booked. The IT/OT link is connected for the historian and planning traffic, through your firewall.

Commanded

No change requested.

Reported by the control point

Vendor route disconnected. IT/OT link connected.

Independently verified

Matches the approved state confirmed at commissioning.

Concept illustration. Commanded, reported and independently verified states are shown separately because they are not the same thing, and what can be verified depends on your deployment.

Questions worth asking

Questions
worth asking.

Bring your zone and conduit drawings and we will work through the boundaries with you, one at a time.

A cut removes the route, not power or control logic. What depends on that route stops talking, which is why each cut is worked out with you and tested in a maintenance window.

See all questions

Your next step

See where physical control fits your plant.

Bring your zone and conduit drawings. We will map the routes with you, then put the first boundary under control.

Discuss your OT boundariesPrefer to see it first? Book a demo

Mark Fermor, Co-Founder & Chief Technology, Security & Marketing Officer
David Bailey, Co-Founder & CEO
Kenny Phipps, Solutions Lead