Vendor remote access
The PLC vendor’s connection has been open since commissioning. With Control, it opens just-in-time when you book a session, to the equipment it is for, then closes.
Routes involved
Vendor support toolsIntegrator VPNsOEM remote access
Who decides: The control systems engineer books each session
Office to plant
An attack in the business network is one link away from plant control. With Control, the IT/OT link is cut on a separate line, as tested, and the plant runs on local control.
Routes involved
IT/OT linkHistorian and MES feedsERP connections
Who decides: Agreed in advance; the operational owner decides
Patch and update routes
Updates cross by whatever route is open at the time. With Control, files cross on one approved path, in a set window, to a named destination.
Routes involved
Patch serversProject file transfersRemovable media workflows
Who decides: Two approvals for each transfer
Links between sites
A problem at one site can travel to every site on the same network. With Control, sites and cells are held apart at Layer 1.
Routes involved
Site-to-site linksCell and line networksRemote stations
Who decides: The network owner agrees each crossing
Critical controllers
Controllers that can reach the office network for no reason. With Control, each critical controller keeps only its defined connections.
Routes involved
Packaging and process PLCsSafety-adjacent controllersHMIs
Who decides: The automation engineer defines the set
Engineering access
Engineering workstations can change controllers at any time. With Control, changes to critical connections need the approvals you set, and each one is recorded.
Routes involved
Engineering workstationsProgramming laptopsRemote engineering
Who decides: The approvals you set