Firevault, offline secure storage, physically disconnected from the internet
Pricing

Controlled Industrial Control Systems

Control who can reach the systems controlling your processes.

Industrial controllers can change physical conditions. An unauthorised command, configuration change or engineering session may affect production, temperatures, pressure or equipment behaviour.

Which routes can reach your PLCs, and do they need to stay connected?

Incident

Path exposed

Outcome

Control taken

Why connection control matters

A connection change is a service decision.

A changed set point can spoil stock, stop a line or put equipment outside safe limits. Cutting communications carelessly can also remove the monitoring and alarms operators rely on.

PLCs and controllers are often reachable through vendor modems, cellular routers, building-management gateways or a standing IT/OT link. Many were never designed to defend themselves, and a remote route can change set points, logic or alarms.

Reported incidents that show these threats

French supermarket chains

Related threat
Unauthorised PLC programming access
What was reported
A cyber attack was reported to have affected refrigeration equipment at supermarkets in France.
Sector
Retail & Supermarkets

Petrochemical plant, Saudi Arabia

2017
Related threat
Compromised engineering workstation
What was reported
Malware targeted safety instrumented systems, the controllers that bring a plant to a safe state, and triggered a shutdown.
Sector
Oil & Gas

Kyiv transmission substation

2016
Related threat
Exposed SCADA or HMI access
What was reported
Malware built for industrial protocols switched off part of the Kyiv supply, showing attacks designed for grid equipment itself.
Sector
Energy

These incidents show how a connection path can shape what happens next. They are not claims about what any single control would have prevented.

How Control responds

What has been achieved.

The assessed controller-access route is governed physically, with local control and safety functions remaining subject to separate engineering validation.

Control access

PLC programming access opens for approved work, then closes.

Remote engineering routes are unavailable by default and connect just-in-time for a set window after independent approval.

Threats it answers

Unauthorised PLC programming access

Control exposure

Unnecessary remote routes to SCADA and HMI are removed.

On-site operator stations keep full control. Remote routes the process does not need are disconnected.

Threats it answers

Exposed SCADA or HMI access

Threat explorer

What threatens your normal operations?

Choose a threat, then step through how Control changes the outcome: normal operation, the threat, the authorised intervention, the controlled state, and verification and restoration.

Choose a threat

Normal operation

See how Control changes the outcome1 / 5 Normal operation

An unauthorised party reaches for a refrigeration controller.

A refrigeration controller needs remote engineering from its supplier, and the supplier connection stays exposed between visits.

Left outside the intervention Local control, safety functions and alarms keep running, subject to separate engineering validation.

Commanded
Nothing commanded.
Reported by the control point
Illustrated connections in their approved state.
Independently verified
Baseline state recorded at deployment.

Concept illustration. Commanded, reported and independently verified states are shown separately because they are not the same thing, and what can be verified depends on your deployment. Disconnecting a selected path changes what can use that path. On its own, it does not contain an incident across a whole environment, and routes outside the plan, such as wireless or cellular links, need their own controls.

Control Blueprints

Your industry’s connections, mapped and controlled.

How Controlled Industrial Control Systems applies in the industries where these connections matter most. Each Blueprint maps real systems, suppliers and operating constraints.

See all industry Blueprints

Fifteen Blueprints are published. Each deployment is designed around your own estate.

Firevault, as featured in

  • TechRadar Pro logo
  • Yahoo Finance logo
  • Channel Insider logo
  • Security Buyer logo
  • SecurityBrief logo

How Control works

Decisions made by people. Enforced physically.

Your tools detect, your people and policies decide, and Control changes the connection state of the selected path. Here is what that rests on.

Physical enforcement

Control changes the connection state of a selected path at Layer 1: connected, or physically disconnected. It does not inspect or alter the traffic on it.

An independent command path

Commands reach each control point over a configured command path, kept separate from the network being controlled. How each point behaves if that path is lost is agreed and tested.

Authorised changes

Who can connect, disconnect or release each path is agreed in advance: named people, more than one approval where it matters, or rules and high-confidence alerts you set.

Evidence, as configured

Commands, approvals and reported states can be recorded for your deployment, so you can show what changed, when, and on whose authority.

Deployment and evidence

What must be understood before control is exercised?

Confirm the selected paths, supporting systems and failure behaviour in the actual environment. No generic drawing can substitute for this assessment.

  1. DependenciesEvery route to each PLC, HMI and controller, including vendor modems and cellular routers.
  2. Intervention authorityWho may open engineering access, and who confirms the work has finished.
  3. Command stateThe instruction sent to each control point, recorded separately from what actually happened.
  4. Reported stateWhat each control point reports after the command, which on its own is not proof.
  5. Independent verificationEngineering validates controller programs, set points and alarms against known good versions.
  6. RestorationHow each controller is confirmed safe before and after every engineering window.

Controllers change physical conditions. Local control, interlocks and safety functions stay outside the intervention and remain subject to separate engineering validation.

Control governs the selected paths in your plan. It does not inspect traffic, and wireless, cellular and other routes outside the plan need their own controls.

Straight answers

No. They detect, filter and investigate. Control adds a physical way to act on the selected paths when your people, or rules you have agreed, decide to.

No. It changes whether a selected path is connected. It does not read or change what travels on it.

It can, which is why the dependencies, safe states and restoration steps for each path are agreed and tested with your operations and safety owners before anything goes live.

It controls selected connectivity. Disconnecting a path removes the connections an AI system was using and gives people an independent way to intervene. It does not necessarily stop a model or process running locally.

No. Control governs connections. Keeping data physically offline is Offline Secure Storage®, a separate Firevault product that can sit alongside Control.

Yes. Start with one connection: a supplier route, an IT–OT crossing, or the path to one critical system.

Your next step

Start with one critical connection.

Begin with one engineering connection. Agree its purpose, intervention authority, dependencies and the checks that make restoration acceptable.

Discuss your Control requirements

Or explore the nine Control Modules first