Firevault, offline secure storage, physically disconnected from the internet
Pricing

Control by Firevault / OT Control

OT Control.Keep engineering access deliberate.

Industrial systems need dependable communications, often across long equipment lifecycles. Physical connection control starts with the process, its dependencies and the engineering work that actually requires access.

Can engineering access close without interrupting the process?

Incident

Path exposed

Outcome

Control taken

Approximately 120–150 ms

Management enable/disable operation

Around 2–3 seconds

SMS round-trip operation, good signal

March 2025 test observations, not guaranteed timings.

Why connection control matters

A connection change is a service decision.

Loss of telemetry, engineering access or shared services may affect production, monitoring or recovery. Process control and safety communications must never be assumed safe to interrupt.

Remote support and IT/OT crossings can extend business-network exposure into an industrial environment. Legacy equipment may have limited protection of its own, but cutting its communications can carry operational consequences.

Reported incidents in related sectors

South Staffs Water

2022
Sector
Water
What was reported
Attackers were inside the network for nearly two years before they were found. Drinking water stayed safe, but customer data was published and the ICO later fined the company.

These incidents show how a connection path can shape what happens next. They are not claims about what any single control would have prevented.

What Control changes

Three things you can control physically.

Control complements your network security, detection, identity management and incident response. It does not replace them. It gives their decisions a physical place to act, on the connections you select.

Where Control applies & Control modules

OT Control. The Modules that make a difference.

A vendor needs a scheduled engineering connection to a supervisory zone. Operations approve the target and work window while local process and safety functions remain outside the selected intervention.

Where do you need Control?

Approved engineering access

Control engineering access without assuming the process stops.

Relay governs the selected maintenance window, Validate establishes required approval through supporting systems, and Isolate defines the assessed IT-to-OT boundary. Local operations and safety remain separately assessed.

Commanded
Permit the assessed engineering task after required approval.
Reported by the control point
Illustrative maintenance path available; separate IT-to-OT path disconnected.
Independently verified
Operations must validate process state, safety dependencies and actual connectivity.

Concept illustration. Commanded, reported and independently verified states are shown separately because they are not the same thing, and what can be verified depends on your deployment. Disconnecting a selected path changes what can use that path. On its own, it does not contain an incident across a whole environment, and routes outside the plan, such as wireless or cellular links, need their own controls.

Control Blueprints

Your industry’s connections, mapped and controlled.

How OT Control applies in the industries where these connections matter most. Each Blueprint maps real systems, suppliers and operating constraints.

See all industry Blueprints

Fourteen Blueprints are published. Each deployment is designed around your own estate.

Firevault, as featured in

  • TechRadar Pro logo
  • Yahoo Finance logo
  • Channel Insider logo
  • Security Buyer logo
  • SecurityBrief logo

How Control works

Decisions made by people. Enforced physically.

Your tools detect, your people and policies decide, and Control changes the connection state of the selected path. Here is what that rests on.

Physical enforcement

Control changes the connection state of a selected path at Layer 1: connected, or physically disconnected. It does not inspect or alter the traffic on it.

An independent command path

Commands reach each control point over a configured command path, kept separate from the network being controlled. How each point behaves if that path is lost is agreed and tested.

Authorised changes

Who can connect, disconnect or release each path is agreed in advance: named people, more than one approval where it matters, or rules and high-confidence alerts you set.

Evidence, as configured

Commands, approvals and reported states can be recorded for your deployment, so you can show what changed, when, and on whose authority.

Before you deploy

Physical control is an operational decision.

Confirm the selected paths, supporting systems and failure behaviour in the actual environment. No generic drawing can substitute for this assessment.

  1. SCADA and supervisory systemsReview process hazards, vendor support requirements and management of change.
  2. Engineering workstations and supplier maintenanceIdentify local control, interlocks and safety-related systems that must keep communicating.
  3. Industrial controllers and plant communicationsTest command loss, power-loss behaviour and restoration in a safe maintenance context.
  4. Selected crossings between enterprise IT and operational zonesAgree emergency support and operational override procedures before deployment.

Control governs the selected paths in your plan. It does not inspect traffic, and wireless, cellular and other routes outside the plan need their own controls.

Straight answers

No. They detect, filter and investigate. Control adds a physical way to act on the selected paths when your people, or rules you have agreed, decide to.

No. It changes whether a selected path is connected. It does not read or change what travels on it.

It can, which is why the dependencies, safe states and restoration steps for each path are agreed and tested with your operations and safety owners before anything goes live.

It controls selected connectivity. Disconnecting a path removes the connections an AI system was using and gives people an independent way to intervene. It does not necessarily stop a model or process running locally.

No. Control governs connections. Keeping data physically offline is Offline Secure Storage®, a separate Firevault product that can sit alongside Control.

Yes. Start with one connection: a supplier route, an IT–OT crossing, or the path to one critical system.

Your next step

Start with one critical connection.

Begin with one engineering connection. Agree its purpose, intervention authority, dependencies and the checks that make restoration acceptable.

Discuss your Control requirements

Or explore the nine Control Modules first